North America Data Center Construction Market – Industry Trends and Forecast to 2029

请求目录 请求目录 与分析师交谈 与分析师交谈 免费样本报告 免费样本报告 购买前请咨询 提前咨询 立即购买 立即购买

North America Data Center Construction Market – Industry Trends and Forecast to 2029

>North America Data Center Construction Market, By Infrastructure Type (Electrical Infrastructure, Mechanical Infrastructure and General Construction), Data Center Type (Tier 1, Tier 2, Tier 3 and Tier 4), Organization Size (Small Size Organization, Medium Size Organization and Large Size Organization), Vertical (Banking, Financial Services and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Retail Colocation, Power and Energy, Manufacturing and Others) – Industry Trends and Forecast to 2029.

预测期 2026 - 2033
复合年增长率(CAGR) 18.30%
2025 年市场规模 USD 19.22 Billion
2033 年市场规模 USD 73.72 Billion

市场规模趋势

2025 USD 19.22 Billion
2029 USD 37.64 Billion
2033 USD 73.72 Billion

区域主导地位

市场覆盖范围 North America

主要参与者

主要参与者的详细信息可在报告中查看。

  • Semiconductors and Electronics
  • North America
  • 350 页
  • 表格数量: 220
  • 图表数量: 60
  • 最后更新日期: 2022年04月18日

North America Data Center Construction Market, By Infrastructure Type (Electrical Infrastructure, Mechanical Infrastructure and General Construction), Data Center Type (Tier 1, Tier 2, Tier 3 and Tier 4), Organization Size (Small Size Organization, Medium Size Organization and Large Size Organization), Vertical (Banking, Financial Services and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Retail Colocation, Power and Energy, Manufacturing and Others) – Industry Trends and Forecast to 2029.

North America Data Center Construction Market

Market Analysis and Size

The data center infrastructure consists of data communication connections, air conditioning, security devices, backup power supplies and fire suppression systems. The infrastructure ensures all the environmental factors are taken into consideration and all the resources are optimally utilized.

North America Data Center Construction Market was valued at USD 15,988.24 million in 2021 and is expected to reach USD 37,660.91 million by 2029, registering a CAGR of 18.30% during the forecast period of 2022-2029. IT and Telecommunications accounts for the largest technology segment in the respective market owing to the extensive usage of data centers in the sector. The market report curated by the Data Bridge Market Research team includes in-depth expert analysis, import/export analysis, pricing analysis, production consumption analysis, and pestle analysis.

Market Definition

Data Center is a state-of-the-art room used to manage IT-related computer systems and equipment. The construction of the data center allows for air circulation under the floor and the tiles. With significant growth in internet usage, advanced software development and installation system and an increase in the number of devices connected to the public and private networks followed by an increasing amount of data.

Report Scope and Market Segmentation

Report Metric

Details

Forecast Period

2022 to 2029

Base Year

2021

Historic Years

2020 (Customizable to 2019 - 2014)

Quantitative Units

Revenue in USD Million, Volumes in Units, Pricing in USD

Segments Covered

Infrastructure Type (Electrical Infrastructure, Mechanical Infrastructure and General Construction), Data Center Type (Tier 1, Tier 2, Tier 3 and Tier 4), Organization Size (Small Size Organization, Medium Size Organization and Large Size Organization), Vertical (Banking, Financial Services and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Retail Colocation, Power and Energy, Manufacturing and Others)

Countries Covered

U.S., Canada and Mexico in North America

Market Players Covered

Turner Construction Company (US), DPR Construction (US), AECOM (US), Schneider Electric (France), M. A. Mortenson Company (US), Arup (UK), Brasfield & Gorrie, L.L.C. (US), CORGAN (US), Currie & Brown Holdings Limited (UK), Fortis Construction (US), Gensler (US), Holder Construction Group, LLC (US), Jacobs (US), ROGERS-O’BRIEN CONSTRUCTION COMPANY, LTD (US), Skanska (Sweden), Structure Tone Organization (US), The Boldt Company (US), among others

Market Opportunities

  • Rise in the construction of hyperscale data centers across the globe
  • Increase in data consumption
  • Penetration of connected devices

North America Data Center Construction Market Dynamics

This section deals with understanding the market drivers, advantages, opportunities, restraints and challenges. All of this is discussed in detail as below:

Drivers

  • Data Consumption

The increase in data consumption is one of the major factors driving the growth of data center construction market. The rise in demand for cloud computing across numerous industries has a positive impact on the market.

  • Construction of Hyperscale Data Centers

The rise in the construction of hyperscale data centers across the globe with the purpose of storing massive amounts of data accelerate the market growth. An increase in consumer data among leading cloud service providers escalating the demand for hyperscale data centers.

  • Government Initiatives

The surge in government initiatives in the form of huge investments and funds further influence the market. A high investment in data center infrastructure is being witnessed by companies operators for maintaining ideal and efficient operating conditions.

Opportunities

Furthermore, penetration of connected devices, and easy access to the internet extend profitable opportunities to the market players in the forecast period of 2022 to 2029. Also, rise in the edge computing will further expand the market.

Restraints/Challenges

On the other hand, high initial investment costs are expected to obstruct market growth. Also, legal and regulatory concerns are projected to challenge the data center construction market in the forecast period of 2022-2029.

This data center construction market report provides details of new recent developments, trade regulations, import-export analysis, production analysis, value chain optimization, market share, impact of domestic and localized market players, analyses opportunities in terms of emerging revenue pockets, changes in market regulations, strategic market growth analysis, market size, category market growths, application niches and dominance, product approvals, product launches, geographic expansions, technological innovations in the market. To gain more info on data center construction market contact Data Bridge Market Research for an Analyst Brief, our team will help you take an informed market decision to achieve market growth.

Covid-19 Impact on North America Data Center Construction Market

The COVID-19 has impacted data center construction market. The limited investment costs and lack of employees hampered sales and production of data center construction. However, government and market key players adopted new safety measures for developing the practices. The advancements in the technology escalated the growth rate of the data center construction market as it targeted the right audience. The data center construction market is expected to regain its pace during the post pandemic scenario due to the easing on the restrictions.

Recent Developments

  • In December 2019, AECOM. led a joint venture with the Central Plateau Cleanup Contract at the Hanford Site to reduce environmental risk. The growing investment in the nuclear end state. The company is going to enhance its brand image along with profit maximization.

North America Data Center Construction Market Scope and Market Size

The data center construction market is segmented on the basis of infrastructure type, data center type, organization size and vertical. The growth amongst these segments will help you analyze meager growth segments in the industries and provide the users with a valuable market overview and market insights to help them make strategic decisions for identifying core market applications.

Infrastructure Type

  • Electrical Infrastructure
  • Mechanical Infrastructure
  • General Construction

On the basis of infrastructure type, the North America data center construction market is segmented into electrical infrastructure, mechanical infrastructure and general construction. Electrical infrastructure segment holds the largest market share in the global data center construction market owing to the factor such as growing construction of mega data centers along with wages of laborers employed and security concerns related to theft/loss of data that has propelled the data center manufacturers to invest in installing advanced security infrastructures which are further helping the segment to dominate the market.

Data Center Type

  • Tier 1
  • Tier 2
  • Tier 3
  • Tier 4

On the basis of data center type, the North America data center construction market is segmented into tier 1, tier 2, tier 3 and tier 4. Tier 3 is dominating the data center type owing to factor such as growing necessity for redundant components for critical applications on the basis of data center’s architecture and site infrastructure which comprises of large companies that is the main reason towards the domination of the segment.

Organization Size

  • Small Size Organization
  • Medium Size Organization
  • Large Size Organization

On the basis of organization size, the North America data center construction market is segmented into small size organization, medium size organization and large size organization. Large size organization is dominating the segment owing to factor that large data centers are characterized by high requirement of computational power and high-server densities which is dynamic cost-effective power management, resource allocation and monitoring of resources is the main reason for the dominance of segment.

Vertical

  • Banking, Financial Services and Insurance
  • IT and Telecommunications
  • Government and Defense
  • Healthcare
  • Retail Colocation
  • Power and Energy
  • Manufacturing
  • Others

On the basis of vertical, the North America data center construction market is segmented into banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, retail colocation, power and energy, manufacturing and others. The IT and telecommunications dominates the market owing to factors such as extensive usage of data centers in the sector for storing a large amount of data which is generated from heavy usage of internet and high penetration of mobiles.

North America Data Center Construction Market Regional Analysis/Insights

The data center construction market is analysed and market size insights and trends are provided by country, infrastructure type, data center type, organization size and vertical as referenced above.

The countries covered in the data center construction market report are U.S., Canada and Mexico in North America.

In North America data center construction market, the U.S. is dominating the data center construction market due to strong hold of the data center construction for the advanced IOT solutions is demanding the growth of the market. Canada data center construction market is growing with strong rate owing to strong project offering by the market players.

The country section of the report also provides individual market impacting factors and changes in regulation in the market domestically that impacts the current and future trends of the market. Data points like down-stream and upstream value chain analysis, technical trends and porter's five forces analysis, case studies are some of the pointers used to forecast the market scenario for individual countries. Also, the presence and availability of global brands and their challenges faced due to large or scarce competition from local and domestic brands, impact of domestic tariffs and trade routes are considered while providing forecast analysis of the country data.   

Competitive Landscape and North America Data Center Construction Market

The data center construction market competitive landscape provides details by competitor. Details included are company overview, company financials, revenue generated, market potential, investment in research and development, new market initiatives, global presence, production sites and facilities, production capacities, company strengths and weaknesses, product launch, product width and breadth, application dominance. The above data points provided are only related to the companies' focus related to data center construction market.

Some of the major players operating in the data center construction market are

  • Turner Construction Company (US)
  • DPR Construction (US)
  • AECOM (US), Schneider Electric (France)
  • M. A. Mortenson Company (US)
  • Arup (UK), Brasfield & Gorrie, L.L.C. (US)
  • CORGAN (US), Currie & Brown Holdings Limited (UK)
  • Fortis Construction (US)
  • Gensler (US)
  • Holder Construction Group, LLC (US)
  • Jacobs (US)
  • ROGERS-O’BRIEN CONSTRUCTION COMPANY, LTD (US)
  • Skanska (Sweden)
  • Structure Tone Organization (US)
  • The Boldt Company (US)


SKU-

在线获取全球首个市场情报云平台的报告访问权限

  • 交互式数据分析仪表板
  • 用于发现高增长潜力机会的公司分析仪表板
  • 研究分析师支持(定制与咨询)
  • 带有交互式仪表板的竞争对手分析
  • 最新新闻、更新与趋势分析
  • 利用基准分析的强大功能,实现全面的竞争对手跟踪
申请演示

目录

1 INTRODUCTION

1.1 OBJECTIVES OF THE STUDY

1.2 MARKET DEFINITION

1.3 OVERVIEW OF NORTH AMERICA DATA CENTER CONSTRUCTION MARKET

1.4 LIMITATIONS

1.5 MARKETS COVERED

2 MARKET SEGMENTATION

2.1 MARKETS COVERED

2.2 GEOGRAPHICAL SCOPE

2.3 YEARS CONSIDERED FOR THE STUDY

2.4 CURRENCY AND PRICING

2.5 DBMR TRIPOD DATA VALIDATION MODEL

2.6 MULTIVARIATE MODELLING

2.7 INFRASTRUCUTRE TYPE LIFELINE CURVE

2.8 PRIMARY INTERVIEWS WITH KEY OPINION LEADERS

2.9 DBMR MARKET POSITION GRID

2.1 VENDOR SHARE ANALYSIS

2.11 SECONDARY SOURCES

2.12 ASSUMPTIONS

3 EXECUTIVE SUMMARY

4 PREMIUM INSIGHTS

5 MARKET OVERVIEW

5.1 DRIVERS

5.1.1 RISING CONSTRUCTION OF HYPERSCALE DATACENTER FACILITIES

5.1.2 INCREASING DEMAND FOR DATA CENTER COLOCATION

5.1.3 GROWING DEMAND OF DATA CENTERS FROM BANKING AND FINANCE SECTOR

5.1.4 RISING DATA TRAFFIC DUE TO IOT AND CLOUD-BASED SERVICES

5.1.5 INTRODUCTION OF INTERCONNECTED DEVICES IN PUBLIC AND PRIVATE SPACES

5.2 RESTRAINTS

5.2.1 HIGH INITIAL INVESTMENT COSTS FOR DATA CENTER CONSTRUCTION

5.2.2 HIGH CARBON EMISSIONS FROM DATA CENTERS

5.3 OPPORTUNITIES

5.3.1 RAPIDLY INCREASING DIGITALIZATION ACROSS THE VERTICALS

5.3.2 INCREASING GENERATION OF UNSTRUCTURED DATA

5.3.3 RISE IN DEMAND FOR GREEN DATA CENTER

5.3.4 5G ROLLOUT TO INCREASE EDGE DATA CENTER INVESTMENTS

5.3.5 RISING GOVERNMENT INITIATIVES TOWARDS CONSTRUCTION OF DATA CENTER

5.4 CHALLENGES

5.4.1 LACK OF SKILLED PERSONNEL

5.4.2 LOCATION OF DATA CENTER CONSTRUCTION

6 COVID-19 IMPACT ON DATA CENTER CONSTRUCTION MARKET

6.1 AFTERMATH OF COVID-19

6.2 STRATEGIC DECISIONS FOR MANUFACTURERS AFTER COVID-19 TO GAIN COMPETITIVE MARKET SHARE

6.3 IMPACT ON DEMAND

6.4 IMPACT ON SUPPLY CHAIN

6.5 CONCLUSION

7 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE

7.1 OVERVIEW

7.2 ELECTRICAL INFRASTRUCTURE

7.2.1 UPS

7.2.2 GENERATORS

7.2.3 RACK POWER DISTRIBUTION UNIT

7.2.4 TRANSFER SWITCHES & SWITCHGEARS

7.2.5 OTHERS

7.3 MECHANICAL

7.3.1 COOLING SYSTEMS

7.3.2 RACKS

7.4 GENERAL INFRASTRUCTURE

7.4.1 BUILDING DEVELOPMENT

7.4.2 PHYSICAL SECURITY

7.4.3 DATA CENTER INFRASTRUCTURE MANAGEMENTSYSTEM

7.4.4 BUILDING DESIGN

7.4.5 INSTALLATION AND COMMISIONING SERVICES

8 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTRE TYPE

8.1 OVERVIEW

8.1.1 TIER III

8.1.2 TIER IV

8.1.3 TIER II

8.1.4 TIER I

 

9 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY ORGANISATION SIZE

9.1 OVERVIEW

9.1.1 LARGE ORGANISATION

9.1.2 SMALL ORGANISATION

9.1.3 MEDIUM ORGANISATION

10 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY VERTICALS

10.1 OVERVIEW

10.1.1 BANKING AND FINANCIAL SERVICES

10.1.2 IT TELECOMMUNICATION

10.1.3 RETAIL COLOCATION

10.1.4 GOVERNEMENT & DEFENSE

10.1.5 HEALTHCARE

10.1.6 MANUFACTURING

10.1.7 POWER & ENERGY

10.1.8 OTHERS

11 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY GEOGRAPHY

11.1 NORTH AMERICA

11.1.1 U.S.

11.1.2 CANADA

11.1.3 MEXICO

12 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, COMPANY LANDSCAPE

12.1 COMPANY SHARE ANALYSIS: NORTH AMERICA

13 SWOT ANALYSIS

14 COMPANY PROFILE

14.1 TURNER CONSTRUCTION COMPANY. (A SUBSIDIARY OF HOCHTIEF AKTIENGESELLSCHAFT)

14.1.1 COMPANY SNAPSHOT

14.1.2 REVENUE ANALYSIS

14.1.3 PROJECT PORTFOLIO

14.1.4 RECENT DEVELOPMENTS

14.2 DPR CONSTRUCTION

14.2.1 COMPANY SNAPSHOT

14.2.2 PRODUCT PORTFOLIO

14.2.3 RECENT DEVELOPMENT

 

14.3 AECOM

14.3.1 COMPANY SNAPSHOT

14.3.2 REVENUE ANALYSIS

14.3.3 PROJECT PORTFOLIO

14.3.4 RECENT DEVELOPMENTS

14.4 FORTIS CONSTRUCTION

14.4.1 COMPANY SNAPSHOT

14.4.2 SERVICE PORTFOLIO

14.4.3 RECENT DEVELOPMENT

14.5 M. A. MORTENSON COMPANY

14.5.1 COMPANY SNAPSHOT

14.5.2 PROJECT PORTFOLIO

14.5.3 RECENT DEVELOPMENTS

14.6 ARUP

14.6.1 COMPANY SNAPSHOT

14.6.2 EXPERTISE PORTFOLIO

14.6.3 RECENT DEVELOPMENT

14.7 BRASFIELD & GORRIE, L.L.C.

14.7.1 COMPANY SNAPSHOT

14.7.2 EXPERTISE PORTFOLIO

14.7.3 RECENT DEVELOPMENTS

14.8 CORGAN

14.8.1 COMPANY SNAPSHOT

14.8.2 PRODUCT PORTFOLIO

14.8.3 RECENT DEVELOPMENT

14.9 CURRIE & BROWN HOLDINGS LIMITED

14.9.1 COMPANY SNAPSHOT

14.9.2 SERVICE PORTFOLIO

14.9.3 RECENT DEVELOPMENT

14.1 GENSLER

14.10.1 COMPANY SNAPSHOT

14.10.2 EXPERTISE PORTFOLIO

14.10.3 RECENT DEVELOPMENT

14.11 HDR

14.11.1 COMPANY SNAPSHOT

14.11.2 SERVICE PORTFOLIO

14.11.3 RECENT DEVELOPMENT

 

14.12 HOLDER CONSTRUCTION GROUP, LLC

14.12.1 COMPANY SNAPSHOT

14.12.2 PROJECT PORTFOLIO

14.12.3 RECENT DEVELOPMENT

14.13 JACOBS

14.13.1 COMPANY SNAPSHOT

14.13.2 REVENUE ANALYSIS

14.13.3 SERVICE PORTFOLIO

14.13.4 RECENT DEVELOPMENTS

14.14 ROGERS-O’BRIEN CONSTRUCTION COMPANY, LTD

14.14.1 COMPANY SNAPSHOT

14.14.2 SERVICE PORTFOLIO

14.14.3 RECENT DEVELOPMENT

14.15 SCHNEIDER ELECTRIC

14.15.1 COMPANY SNAPSHOT

14.15.2 REVENUE ANALYSIS

14.15.3 SERVICE PORTFOLIO

14.15.4 RECENT DEVELOPMENTS

14.16 SKANSKA

14.16.1 COMPANY SNAPSHOT

14.16.2 REVENUE ANALYSIS

14.16.3 SERVICE PORTFOLIO

14.16.4 RECENT DEVELOPMENT

14.17 STRUCTURE TONE ORGANIZATION

14.17.1 COMPANY SNAPSHOT

14.17.2 SERVICE PORTFOLIO

14.17.3 RECENT DEVELOPMENTS

14.18 THE BOLDT COMPANY

14.18.1 COMPANY SNAPSHOT

14.18.2 SERVICE PORTFOLIO

14.18.3 RECENT DEVELOPMENT

15 QUESTIONNAIRE

16 RELATED REPORTS

表格列表

 LIST OF TABLES

TABLE 1 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)

TABLE 2 NORTH AMERICA ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 3 NORTH AMERICA UPS IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 4 NORTH AMERICA GENRATORS IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 5 NORTH AMERICA RACK POWER IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 6 NORTH AMERICA TRANSFER SWITCHES & SWICTHGEAR IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 7 NORTH AMERICA OTHERS IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 8 NORTH AMERICA MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 9 NORTH AMERICA COOLING SYSTEM IN MECHANICAL CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 10 NORTH AMERICA RACKS IN MECHANICAL CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 11 NORTH AMERICA GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 12 NORTH AMERICA BUILDING DEVELOPMENT IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 13 NORTH AMERICA PHYSICAL SECURITY IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 14 NORTH AMERICADATA CENTRE INFRASTRUCTURE MANAGEMENTSYSTEM IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 15 NORTH AMERICA BUILDING DEVELOPMENT IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 16 NORTH AMERICA INFRASTRUCTURE AND COMMISIONING SERVICES IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 17 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)

TABLE 18 NORTH AMERICA TIER III DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 19 NORTH AMERICA TIER IV DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 20 NORTH AMERICA TIER IV DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 21 NORTH AMERICA TIER IV DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 22 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY ORGANISATION SIZE, 2018-2027 (USD MILLION)

TABLE 23 NORTH AMERICALARGE ORGANISATION DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 24 NORTH AMERICASMALL ORGANISATION DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 25 NORTH AMERICAMEDIUM ORGANISATION DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 26 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)

TABLE 27 NORTH AMERICABANKING AND FINANCIAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 28 NORTH AMERICAIT TELECOMMUNICATIONIN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 29 NORTH AMERICARETAIL IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 30 NORTH AMERICAGOVERNEMNT & DEFENSEIN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 31 NORTH AMERICAHELATHCARE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 32 NORTH AMERICAMANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 33 NORTH AMERICAPOWER & ENERGY IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 34 NORTH AMERICAOTHERS IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 35 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY COUNTRY, 2018-2027 (USD MILLION)

TABLE 36 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)

TABLE 37 NORTH AMERICA ELECTRICAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BYTYPE, 2018-2027 (USD MILLION)

TABLE 38 NORTH AMERICA MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 39 NORTH AMERICA COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 40 NORTH AMERICA GENERAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 41 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)

TABLE 42 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018-2027 (USD MILLION)

TABLE 43 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)

TABLE 44 U.S. DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)

TABLE 45 U.S. ELECTRICAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BYTYPE, 2018-2027 (USD MILLION)

TABLE 46 U.S. MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 47 U.S. COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 48 U.S. GENERAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 49 U.S. DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)

TABLE 50 U.S. DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018-2027 (USD MILLION)

TABLE 51 U.S. DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)

TABLE 52 CANADA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)

TABLE 53 CANADA ELECTRICAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BYTYPE, 2018-2027 (USD MILLION)

TABLE 54 CANADA MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 55 CANADA COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 56 CANADA GENERAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 57 CANADA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)

TABLE 58 CANADA DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018-2027 (USD MILLION)

TABLE 59 CANADA DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)

TABLE 60 MEXICO DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)

TABLE 61 MEXICO ELECTRICAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BYTYPE, 2018-2027 (USD MILLION)

TABLE 62 MEXICO MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 63 MEXICO COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 64 MEXICO GENERAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 65 MEXICO DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)

TABLE 66 MEXICO DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018-2027 (USD MILLION)

TABLE 67 MEXICO DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)

图片列表

LIST OF FIGURES 

FIGURE 1 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: SEGMENTATION

FIGURE 2 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: DATA TRIANGULATION

FIGURE 3 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: DROC ANALYSIS

FIGURE 4 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: NORTH AMERICA VS GLOBAL MARKET ANALYSIS

FIGURE 5 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: COMPANY RESEARCH ANALYSIS

FIGURE 6 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: INTERVIEW DEMOGRAPHICS

FIGURE 7 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: DBMR MARKET POSITION GRID

FIGURE 8 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: VENDOR SHARE ANALYSIS

FIGURE 9 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: SEGMENTATION

FIGURE 10 RISING CONSTRUCTION OF HYPERSCALE DATA CENTER FACILITIES IS MAJOR FACTOR DRIVE THE NORTH AMERICA DATA CENTER CONSTRUCTION MARKET IN THE FORECAST PERIOD OF 2020TO 2027

FIGURE 11 ELECTRICAL INFRASTRUCTURE SEGMENT IS EXPECTED TO ACCOUNT FOR THE LARGEST SHARE OF THE NORTH AMERICA DATA CENTER CONSTRUCTION MARKET IN 2020 & 2027

FIGURE 12 DRIVERS, RESTRAINTS, OPPORTUNITIES AND CHALLENGES OF NORTH AMERICA DATA CENTER CONSTRUCTION MARKET

FIGURE 13 ENERGY CONSUMPTION OF DATA CENTER AND OFFICE BUILDINGS

FIGURE 14 ELECTRICITY GENERATION BY FUEL TYPE FOR U.S.

FIGURE 15 ENVIRONMENTAL IMPACT OF BUILDINGS

FIGURE 16 DATA CENTER POWER DRAWS

FIGURE 17 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: BY INFRASTRUCTURE TYPE, 2019

FIGURE 18 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: BY DATA CENTER YPE, 2019

FIGURE 19 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: BY ORGANISATION SIZE, 2019

FIGURE 20 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: BY VERTICALS, 2019

FIGURE 21 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: SNAPSHOT (2019)

FIGURE 22 NORTH AMERICA DATA CENTER CONSTRUCTIONMARKET: BY COUNTRY (2019)

FIGURE 23 NORTH AMERICA DATA CENTER CONSTRUCTIONMARKET: BY COUNTRY (2020 & 2027)

FIGURE 24 NORTH AMERICA DATA CENTER CONSTRUCTIONMARKET: BY COUNTRY (2019 & 2027)

FIGURE 25 NORTH AMERICA DATA CENTER CONSTRUCTIONMARKET: BY APPLICATION(2020-2027)

FIGURE 26 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: COMPANY SHARE 2019 (%)

查看详细信息 Right Arrow

研究方法

数据收集和基准年分析是使用具有大样本量的数据收集模块完成的。该阶段包括通过各种来源和策略获取市场信息或相关数据。它包括提前检查和规划从过去获得的所有数据。它同样包括检查不同信息源中出现的信息不一致。使用市场统计和连贯模型分析和估计市场数据。此外,市场份额分析和关键趋势分析是市场报告中的主要成功因素。要了解更多信息,请请求分析师致电或下拉您的询问。

DBMR 研究团队使用的关键研究方法是数据三角测量,其中包括数据挖掘、数据变量对市场影响的分析和主要(行业专家)验证。数据模型包括供应商定位网格、市场时间线分析、市场概览和指南、公司定位网格、专利分析、定价分析、公司市场份额分析、测量标准、全球与区域和供应商份额分析。要了解有关研究方法的更多信息,请向我们的行业专家咨询。

可定制

Data Bridge Market Research 是高级形成性研究领域的领导者。我们为向现有和新客户提供符合其目标的数据和分析而感到自豪。报告可定制,包括目标品牌的价格趋势分析、了解其他国家的市场(索取国家列表)、临床试验结果数据、文献综述、翻新市场和产品基础分析。目标竞争对手的市场分析可以从基于技术的分析到市场组合策略进行分析。我们可以按照您所需的格式和数据样式添加您需要的任意数量的竞争对手数据。我们的分析师团队还可以为您提供原始 Excel 文件数据透视表(事实手册)中的数据,或者可以帮助您根据报告中的数据集创建演示文稿。

常见问题

北美数据中心建设市场预计将在2029年的预测期间以18.30%的CAGR增长.
北美数据中心建筑市场预计到2029年将达到376.091亿美元。
在北美数据中心建筑市场经营的主要角色有:特纳建筑公司(美国),DPR建筑公司(美国),AECOM(美国),Schneider Electric(法国),M. A. Mortenson公司(美国),Arup(英国),Brasfield & Gorrie,L.L.C.(美国),CORGAN(美国),Currie & Brown控股有限公司(英国),Fortis建筑公司(美国),Gensler(美国),Holder建筑集团,LLC(美国),Jacobos(美国),ROGERS-O'BRIEN Constructionation COMPANY,LTD(美国),Skanska(瑞典),结构托恩组织(美国),The Boldt公司(美国)等.
北美数据中心建设市场覆盖的主要国家有北美的美国,加拿大和墨西哥.
北美数据中心建筑市场规模在2025年被估价为192.2亿美元.
北美数据中心建设市场将在2026至2033年的预测期间以18.30%的CAGR增长.
北美数据中心建设市场根据基础设施类型,数据中心类型,组织规模,垂直划分为四个值得注意的部分. 根据基础设施类型,市场分为电力基础设施、机械基础设施和一般建筑。 根据数据中心类型,市场分为1级、2级、3级和4级。 根据组织规模,将市场划分为小规模组织,中规模组织,大规模组织. 在纵向基础上,市场分为银行、金融服务和保险、信息技术和电信、政府和国防、保健、零售、电力和能源、制造业等。
Turner Construction Company (U.S.),DPR Construction (U.S.),AECOM (U.S.),Schneider Electric (法国),M. A. Mortenson Company (U.S.)等公司是北美数据中心建筑市场的主要公司.

行业相关报告

客户评价