Europe Data Center Construction Market – Industry Trends and Forecast to 2030

back-icon

Back to Report

Request for TOC Request for TOC Speak to Analyst Speak to Analyst Free Sample Report Free Sample Report Inquire Before Buying Inquire Before Buy Now Buy Now

Europe Data Center Construction Market – Industry Trends and Forecast to 2030

  • ICT
  • Published Report
  • May 2023
  • Europe
  • 350 Pages
  • No of Tables: 304
  • No of Figures: 31

Table of Content

1 INTRODUCTION

1.1 OBJECTIVES OF THE STUDY

1.2 MARKET DEFINITION

1.3 OVERVIEW OF THE EUROPE DATA CENTER CONSTRUCTION MARKET

1.4 CURRENCY AND PRICING

1.5 LIMITATIONS

1.6 MARKETS COVERED

2 MARKET SEGMENTATION

2.1 MARKETS COVERED

2.2 YEARS CONSIDERED FOR THE STUDY

2.3 GEOGRAPHIC SCOPE

2.4 DBMR TRIPOD DATA VALIDATION MODEL

2.5 PRIMARY INTERVIEWS WITH KEY OPINION LEADERS

2.6 DBMR MARKET POSITION GRID

2.7 VENDOR SHARE ANALYSIS

2.8 END-USER COVERAGE GRID

2.9 MULTIVARIATE MODELLING

2.1 INFRASTRUCTRE TYPE TIMELINE CURVE

2.11 CHALLENGE MATRIX

2.12 SECONDARY SOURCES

2.13 ASSUMPTIONS

3 EXECUTIVE SUMMARY

4 PREMIUM INSIGHTS

4.1 DATA CENTER CONSTRUCTION

4.2 PHARMACEUTICAL FACTORIES CONSTRUCTION

5 MARKET OVERVIEW

5.1 DRIVERS

5.1.1 GROWING DEMAND FOR DATA CENTERS INFRASTRUCTURE

5.1.2 SURGE IN DEMAND FOR HYPER SCALE DATA CENTER FACILITIES

5.1.3 RAPID GROWTH IN CLOUD, AI/ML-BASED SERVICES

5.1.4 INCREASE IN DEMAND FOR STORING UNSTRUCTURED DATA

5.2 RESTRAINTS

5.2.1 HIGH INITIAL AND MAINTENANCE COSTS FOR DATA CENTERS

5.2.2 HIGH CARBON FOOTPRINT OF DATA CENTERS

 

5.3 OPPORTUNITIES

5.3.1 UPSURGE IN DEMAND FOR DATA STORAGE AND MANAGEMENT CAPABILITIES IN FINANCIAL SECTORS

5.3.2 EMERGENCE OF 5G TO INCREASE DATA CENTERS INVESTMENTS

5.4 CHALLENGES

5.4.1 HIGH COMPLEXITY INVOLVED IN DATA CENTER CONSTRUCTION

5.4.2 LACK OF SKILLED WORKFORCE AND EXPERTISE FOR DATA CENTER CONSTRUCTION

6 EUROPE DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE

6.1 OVERVIEW

6.2 ELECTRICAL INFRASTRUCTURE

6.2.1 POWER DISTRIBUTION AND MEASUREMENT

6.2.2 UPS SYSTEMS

6.2.3 GENERATORS

6.2.4 CABLING INFRASTRUCTURE

6.2.5 TRANSFER SWITCHES & SWITCHGEAR

6.2.6 POWER BACK UP

6.2.7 OTHERS

6.3 MECHANICAL INFRASTRUCTURE

6.3.1 AIR CONDITIONING

6.3.2 CHILLERS

6.3.3 COOLING TOWERS

6.3.4 SERVER COOLING

6.3.5 MANAGEMENT SYSTEM

6.3.6 ECONOMIZERS

6.3.7 OTHERS

6.4 GENERAL INFRASTRUCTURE

6.4.1 BUILDING DEVELOPMENT

6.4.2 INSTALLATION

6.4.3 COMMISSIONING SERVICES

7 EUROPE DATA CENTER CONSTRUCTION MARKET, BY OFFERING

7.1 OVERVIEW

7.2 SOLUTIONS

7.2.1 HVAC

7.2.2 COOLING SOLUTIONS

7.2.3 BUILDING AUTOMATION AND CONTROL SYSTEM (BACS)

7.2.4 OTHERS

 

7.3 SERVICES

7.3.1 MANAGED SERVICES

7.3.2 PROFESSIONAL SERVICES

7.3.2.1 DESIGN AND CONSULTING

7.3.2.2 INSTALLATION AND INTEGRATION

7.3.2.3 SUPPORT AND MAINTENANCE

7.3.2.4 TRAINING AND EDUCATION

8 EUROPE DATA CENTER CONSTRUCTION MARKET, BY TIER STANDARDS

8.1 OVERVIEW

8.2 TIER III

8.3 TIER II

8.4 TIER IV

8.5 TIER I

9 EUROPE DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE/ DATA CENTER SIZE

9.1 OVERVIEW

9.2 SMALL SCALE DC

9.2.1 RACK-BASED COOLING

9.2.2 ROW-BASED COOLING

9.2.3 ROOM-BASED COOLING

9.3 MEDIUM SCALE DC

9.3.1 RACK-BASED COOLING

9.3.2 ROW-BASED COOLING

9.3.3 ROOM-BASED COOLING

9.4 LARGE SCALE DC

9.4.1 ROW-BASED COOLING

9.4.2 ROOM-BASED COOLING

9.4.3 RACK-BASED COOLING

10 EUROPE DATA CENTER CONSTRUCTION MARKET, BY TYPE

10.1 OVERVIEW

10.2 COLOCATION DATA CENTERS

10.3 HYPER SCALE DATA CENTER

10.4 CLOUD DATA CENTER

10.5 MANAGED SERVICES DATA CENTERS

10.6 ENTERPRISE DATA CENTER

10.7 EDGE DATA CENTER

 

11 EUROPE DATA CENTER CONSTRUCTION MARKET, BY END-USER

11.1 OVERVIEW

11.2 BANKING, FINANCIAL SERVICES AND INSURANCE (BFSI)

11.2.1 SOLUTIONS

11.2.2 SERVICES

11.3 GOVERNMENT

11.3.1 SOLUTIONS

11.3.2 SERVICES

11.4 IT AND TELECOMMUNICATION

11.4.1 SOLUTIONS

11.4.2 SERVICES

11.5 RETAIL & E-COMMERCE

11.5.1 SOLUTIONS

11.5.2 SERVICES

11.6 HEALTHCARE

11.6.1 SOLUTIONS

11.6.2 SERVICES

11.7 MANUFACTURING

11.7.1 SOLUTIONS

11.7.2 SERVICES

11.8 MEDIA AND ENTERTAINMENT

11.8.1 SOLUTIONS

11.8.2 SERVICES

11.9 PHARMACEUTICAL

11.9.1 SOLUTIONS

11.9.2 SERVICES

11.1 RESEARCH & ACADEMIC

11.10.1 SOLUTIONS

11.10.2 SERVICES

11.11 ENERGY & UTILITY

11.11.1 SOLUTIONS

11.11.2 SERVICES

11.12 OTHERS

 

12 EUROPE DATA CENTER CONSTRUCTION MARKET

12.1 EUROPE

12.1.1 GERMANY

12.1.2 U.K.

12.1.3 FRANCE

12.1.4 NETHERLANDS

12.1.5 RUSSIA

12.1.6 ITALY

12.1.7 SPAIN

12.1.8 SWITZERLAND

12.1.9 BELGIUM

12.1.10 IRELAND

12.1.11 TURKEY

12.1.12 REST OF EUROPE

13 EUROPE DATA CENTER CONSTRUCTION MARKET: COMPANY LANDSCAPE

13.1 COMPANY SHARE ANALYSIS: EUROPE

14 SWOT ANALYSIS

15 COMPANY PROFILES

15.1 ORACLE

15.1.1 COMPANY SNAPSHOT

15.1.2 REVENUE ANALYSIS

15.1.3 SOLUTION PORTFOLIO

15.1.4 RECENT DEVELOPMENTS

15.2 CISCO SYSTEMS, INC.

15.2.1 COMPANY SNAPSHOT

15.2.2 REVENUE ANALYSIS

15.2.3 SOLUTION PORTFOLIO

15.2.4 RECENT DEVELOPMENTS

15.3 EQUINIX, INC.

15.3.1 COMPANY SNAPSHOT

15.3.2 REVENUE ANALYSIS

15.3.3 PRODUCTS PORTFOLIO

15.3.4 RECENT DEVELOPMENTS

15.4 DELL INC.

15.4.1 COMPANY SNAPSHOT

15.4.2 REVENUE ANALYSIS

15.4.3 SOLUTION & SERVICES PORTFOLIO

15.4.4 RECENT DEVELOPMENTS

15.5 LENOVO

15.5.1 COMPANY SNAPSHOT

15.5.2 REVENUE ANALYSIS

15.5.3 SOLUTION PORTFOLIO

15.5.4 RECENT DEVELOPMENTS

15.6 FUJITSU

15.6.1 COMPANY SNAPSHOT

15.6.2 REVENUE ANALYSIS

15.6.3 SERVICES PORTFOLIO

15.6.4 RECENT DEVELOPMENTS

15.7 HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP

15.7.1 COMPANY SNAPSHOT

15.7.2 REVENUE ANALYSIS

15.7.3 SOLUTION PORTFOLIO

15.7.4 RECENT DEVELOPMENTS

15.8 HITACHI VANTARA

15.8.1 COMPANY SNAPSHOT

15.8.2 REVENUE ANALYSIS

15.8.3 SOLUTION PORTFOLIO

15.8.4 RECENT DEVELOPMENTS

15.9 IBM CORPORATION

15.9.1 COMPANY SNAPSHOT

15.9.2 REVENUE ANALYSIS

15.9.3 SOLUTION PORTFOLIO

15.9.4 RECENT DEVELOPMENTS

15.1 JUNIPER NETWORKS, INC.

15.10.1 COMPANY SNAPSHOT

15.10.2 REVENUE ANALYSIS

15.10.3 SOLUTION PORTFOLIO

15.10.4 RECENT DEVELOPMENTS

15.11 RITTAL GMBH & CO. KG

15.11.1 COMPANY SNAPSHOT

15.11.2 PRODUCT PORTFOLIO

15.11.3 RECENT DEVELOPMENTS

15.12 SCHNEIDER ELECTRIC

15.12.1 COMPANY SNAPSHOT

15.12.2 REVENUE ANALYSIS

15.12.3 SOLUTION PORTFOLIO

15.12.4 RECENT DEVELOPMENTS

 

16 QUESTIONNAIRE

17 RELATED REPORTS

List of Table

TABLE 1 DATA CENTERS CONSTRUCTION DETAILS

TABLE 2 PHARMACEUTICAL FACTORIES CONSTRUCTION DETAILS

TABLE 3 EUROPE DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2021-2030 (USD MILLION)

TABLE 4 EUROPE ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 5 EUROPE MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 6 EUROPE GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 7 EUROPE DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 8 EUROPE SOLUTIONS IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 9 EUROPE SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 10 EUROPE PROFESSIONAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 11 EUROPE DATA CENTER CONSTRUCTION MARKET, BY TIER STANDARDS, 2021-2030 (USD MILLION)

TABLE 12 EUROPE DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE/ DATA CENTER SIZE, 2021-2030 (USD MILLION)

TABLE 13 EUROPE SMALL SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 14 EUROPE MEDIUM SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 15 EUROPE LARGE SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 16 EUROPE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 17 EUROPE DATA CENTER CONSTRUCTION MARKET, BY END-USER, 2021-2030 (USD MILLION)

TABLE 18 EUROPE BANKING, FINANCIAL SERVICES AND INSURANCE (BFSI) IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 19 EUROPE GOVERNMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 20 EUROPE IT AND TELECOMMUNICATION IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 21 EUROPE RETAIL & E-COMMERCE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 22 EUROPE HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 23 EUROPE MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 24 EUROPE MEDIA AND ENTERTAINMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 25 EUROPE PHARMACEUTICAL IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 26 EUROPE RESEARCH & ACADEMIC IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 27 EUROPE ENERGY & UTILITY IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 28 EUROPE DATA CENTER CONSTRUCTION MARKET, BY COUNTRY, 2021-2030 (USD MILLION)

TABLE 29 GERMANY DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2021-2030 (USD MILLION)

TABLE 30 GERMANY ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 31 GERMANY MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 32 GERMANY GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 33 GERMANY DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 34 GERMANY SOLUTIONS IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 35 GERMANY SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 36 GERMANY PROFESSIONAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 37 GERMANY DATA CENTER CONSTRUCTION MARKET, BY TIER STANDARDS, 2021-2030 (USD MILLION)

TABLE 38 GERMANY DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE/ DATA CENTER SIZE, 2021-2030 (USD MILLION)

TABLE 39 GERMANY SMALL SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 40 GERMANY MEDIUM SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 41 GERMANY LARGE SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 42 GERMANY DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 43 GERMANY DATA CENTER CONSTRUCTION MARKET, BY END-USER, 2021-2030 (USD MILLION)

TABLE 44 GERMANY BANKING, FINANCIAL SERVICES AND INSURANCE (BFSI) IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 45 GERMANY GOVERNMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 46 GERMANY IT AND TELECOMMUNICATION IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 47 GERMANY RETAIL & E-COMMERCE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 48 GERMANY HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 49 GERMANY MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 50 GERMANY MEDIA AND ENTERTAINMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 51 GERMANY PHARMACEUTICAL IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 52 GERMANY RESEARCH & ACADEMIC IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 53 GERMANY ENERGY & UTILITY IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 54 U.K. DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2021-2030 (USD MILLION)

TABLE 55 U.K. ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 56 U.K. MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 57 U.K. GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 58 U.K. DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 59 U.K. SOLUTIONS IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 60 U.K. SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 61 U.K. PROFESSIONAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 62 U.K. DATA CENTER CONSTRUCTION MARKET, BY TIER STANDARDS, 2021-2030 (USD MILLION)

TABLE 63 U.K. DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE/ DATA CENTER SIZE, 2021-2030 (USD MILLION)

TABLE 64 U.K. SMALL SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 65 U.K. MEDIUM SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 66 U.K. LARGE SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 67 U.K. DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 68 U.K. DATA CENTER CONSTRUCTION MARKET, BY END-USER, 2021-2030 (USD MILLION)

TABLE 69 U.K. BANKING, FINANCIAL SERVICES AND INSURANCE (BFSI) IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 70 U.K. GOVERNMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 71 U.K. IT AND TELECOMMUNICATION IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 72 U.K. RETAIL & E-COMMERCE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 73 U.K. HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 74 U.K. MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 75 U.K. MEDIA AND ENTERTAINMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 76 U.K. PHARMACEUTICAL IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 77 U.K. RESEARCH & ACADEMIC IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 78 U.K. ENERGY & UTILITY IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 79 FRANCE DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2021-2030 (USD MILLION)

TABLE 80 FRANCE ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 81 FRANCE MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 82 FRANCE GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 83 FRANCE DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 84 FRANCE SOLUTIONS IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 85 FRANCE SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 86 FRANCE PROFESSIONAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 87 FRANCE DATA CENTER CONSTRUCTION MARKET, BY TIER STANDARDS, 2021-2030 (USD MILLION)

TABLE 88 FRANCE DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE/ DATA CENTER SIZE, 2021-2030 (USD MILLION)

TABLE 89 FRANCE SMALL SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 90 FRANCE MEDIUM SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 91 FRANCE LARGE SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 92 FRANCE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 93 FRANCE DATA CENTER CONSTRUCTION MARKET, BY END-USER, 2021-2030 (USD MILLION)

TABLE 94 FRANCE BANKING, FINANCIAL SERVICES AND INSURANCE (BFSI) IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 95 FRANCE GOVERNMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 96 FRANCE IT AND TELECOMMUNICATION IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 97 FRANCE RETAIL & E-COMMERCE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 98 FRANCE HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 99 FRANCE MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 100 FRANCE MEDIA AND ENTERTAINMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 101 FRANCE PHARMACEUTICAL IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 102 FRANCE RESEARCH & ACADEMIC IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 103 FRANCE ENERGY & UTILITY IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 104 NETHERLANDS DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2021-2030 (USD MILLION)

TABLE 105 NETHERLANDS ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 106 NETHERLANDS MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 107 NETHERLANDS GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 108 NETHERLANDS DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 109 NETHERLANDS SOLUTIONS IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 110 NETHERLANDS SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 111 NETHERLANDS PROFESSIONAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 112 NETHERLANDS DATA CENTER CONSTRUCTION MARKET, BY TIER STANDARDS, 2021-2030 (USD MILLION)

TABLE 113 NETHERLANDS DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE/ DATA CENTER SIZE, 2021-2030 (USD MILLION)

TABLE 114 NETHERLANDS SMALL SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 115 NETHERLANDS MEDIUM SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 116 NETHERLANDS LARGE SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 117 NETHERLANDS DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 118 NETHERLANDS DATA CENTER CONSTRUCTION MARKET, BY END-USER, 2021-2030 (USD MILLION)

TABLE 119 NETHERLANDS BANKING, FINANCIAL SERVICES AND INSURANCE (BFSI) IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 120 NETHERLANDS GOVERNMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 121 NETHERLANDS IT AND TELECOMMUNICATION IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 122 NETHERLANDS RETAIL & E-COMMERCE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 123 NETHERLANDS HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 124 NETHERLANDS MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 125 NETHERLANDS MEDIA AND ENTERTAINMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 126 NETHERLANDS PHARMACEUTICAL IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 127 NETHERLANDS RESEARCH & ACADEMIC IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 128 NETHERLANDS ENERGY & UTILITY IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 129 RUSSIA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2021-2030 (USD MILLION)

TABLE 130 RUSSIA ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 131 RUSSIA MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 132 RUSSIA GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 133 RUSSIA DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 134 RUSSIA SOLUTIONS IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 135 RUSSIA SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 136 RUSSIA PROFESSIONAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 137 RUSSIA DATA CENTER CONSTRUCTION MARKET, BY TIER STANDARDS, 2021-2030 (USD MILLION)

TABLE 138 RUSSIA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE/ DATA CENTER SIZE, 2021-2030 (USD MILLION)

TABLE 139 RUSSIA SMALL SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 140 RUSSIA MEDIUM SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 141 RUSSIA LARGE SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 142 RUSSIA DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 143 RUSSIA DATA CENTER CONSTRUCTION MARKET, BY END-USER, 2021-2030 (USD MILLION)

TABLE 144 RUSSIA BANKING, FINANCIAL SERVICES AND INSURANCE (BFSI) IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 145 RUSSIA GOVERNMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 146 RUSSIA IT AND TELECOMMUNICATION IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 147 RUSSIA RETAIL & E-COMMERCE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 148 RUSSIA HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 149 RUSSIA MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 150 RUSSIA MEDIA AND ENTERTAINMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 151 RUSSIA PHARMACEUTICAL IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 152 RUSSIA RESEARCH & ACADEMIC IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 153 RUSSIA ENERGY & UTILITY IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 154 ITALY DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2021-2030 (USD MILLION)

TABLE 155 ITALY ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 156 ITALY MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 157 ITALY GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 158 ITALY DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 159 ITALY SOLUTIONS IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 160 ITALY SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 161 ITALY PROFESSIONAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 162 ITALY DATA CENTER CONSTRUCTION MARKET, BY TIER STANDARDS, 2021-2030 (USD MILLION)

TABLE 163 ITALY DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE/ DATA CENTER SIZE, 2021-2030 (USD MILLION)

TABLE 164 ITALY SMALL SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 165 ITALY MEDIUM SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 166 ITALY LARGE SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 167 ITALY DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 168 ITALY DATA CENTER CONSTRUCTION MARKET, BY END-USER, 2021-2030 (USD MILLION)

TABLE 169 ITALY BANKING, FINANCIAL SERVICES AND INSURANCE (BFSI) IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 170 ITALY GOVERNMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 171 ITALY IT AND TELECOMMUNICATION IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 172 ITALY RETAIL & E-COMMERCE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 173 ITALY HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 174 ITALY MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 175 ITALY MEDIA AND ENTERTAINMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 176 ITALY PHARMACEUTICAL IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 177 ITALY RESEARCH & ACADEMIC IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 178 ITALY ENERGY & UTILITY IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 179 SPAIN DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2021-2030 (USD MILLION)

TABLE 180 SPAIN ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 181 SPAIN MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 182 SPAIN GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 183 SPAIN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 184 SPAIN SOLUTIONS IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 185 SPAIN SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 186 SPAIN PROFESSIONAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 187 SPAIN DATA CENTER CONSTRUCTION MARKET, BY TIER STANDARDS, 2021-2030 (USD MILLION)

TABLE 188 SPAIN DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE/ DATA CENTER SIZE, 2021-2030 (USD MILLION)

TABLE 189 SPAIN SMALL SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 190 SPAIN MEDIUM SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 191 SPAIN LARGE SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 192 SPAIN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 193 SPAIN DATA CENTER CONSTRUCTION MARKET, BY END-USER, 2021-2030 (USD MILLION)

TABLE 194 SPAIN BANKING, FINANCIAL SERVICES AND INSURANCE (BFSI) IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 195 SPAIN GOVERNMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 196 SPAIN IT AND TELECOMMUNICATION IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 197 SPAIN RETAIL & E-COMMERCE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 198 SPAIN HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 199 SPAIN MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 200 SPAIN MEDIA AND ENTERTAINMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 201 SPAIN PHARMACEUTICAL IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 202 SPAIN RESEARCH & ACADEMIC IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 203 SPAIN ENERGY & UTILITY IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 204 SWITZERLAND DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2021-2030 (USD MILLION)

TABLE 205 SWITZERLAND ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 206 SWITZERLAND MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 207 SWITZERLAND GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 208 SWITZERLAND DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 209 SWITZERLAND SOLUTIONS IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 210 SWITZERLAND SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 211 SWITZERLAND PROFESSIONAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 212 SWITZERLAND DATA CENTER CONSTRUCTION MARKET, BY TIER STANDARDS, 2021-2030 (USD MILLION)

TABLE 213 SWITZERLAND DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE/ DATA CENTER SIZE, 2021-2030 (USD MILLION)

TABLE 214 SWITZERLAND SMALL SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 215 SWITZERLAND MEDIUM SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 216 SWITZERLAND LARGE SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 217 SWITZERLAND DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 218 SWITZERLAND DATA CENTER CONSTRUCTION MARKET, BY END-USER, 2021-2030 (USD MILLION)

TABLE 219 SWITZERLAND BANKING, FINANCIAL SERVICES AND INSURANCE (BFSI) IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 220 SWITZERLAND GOVERNMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 221 SWITZERLAND IT AND TELECOMMUNICATION IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 222 SWITZERLAND RETAIL & E-COMMERCE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 223 SWITZERLAND HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 224 SWITZERLAND MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 225 SWITZERLAND MEDIA AND ENTERTAINMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 226 SWITZERLAND PHARMACEUTICAL IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 227 SWITZERLAND RESEARCH & ACADEMIC IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 228 SWITZERLAND ENERGY & UTILITY IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 229 BELGIUM DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2021-2030 (USD MILLION)

TABLE 230 BELGIUM ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 231 BELGIUM MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 232 BELGIUM GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 233 BELGIUM DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 234 BELGIUM SOLUTIONS IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 235 BELGIUM SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 236 BELGIUM PROFESSIONAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 237 BELGIUM DATA CENTER CONSTRUCTION MARKET, BY TIER STANDARDS, 2021-2030 (USD MILLION)

TABLE 238 BELGIUM DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE/ DATA CENTER SIZE, 2021-2030 (USD MILLION)

TABLE 239 BELGIUM SMALL SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 240 BELGIUM MEDIUM SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 241 BELGIUM LARGE SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 242 BELGIUM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 243 BELGIUM DATA CENTER CONSTRUCTION MARKET, BY END-USER, 2021-2030 (USD MILLION)

TABLE 244 BELGIUM BANKING, FINANCIAL SERVICES AND INSURANCE (BFSI) IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 245 BELGIUM GOVERNMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 246 BELGIUM IT AND TELECOMMUNICATION IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 247 BELGIUM RETAIL & E-COMMERCE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 248 BELGIUM HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 249 BELGIUM MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 250 BELGIUM MEDIA AND ENTERTAINMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 251 BELGIUM PHARMACEUTICAL IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 252 BELGIUM RESEARCH & ACADEMIC IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 253 BELGIUM ENERGY & UTILITY IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 254 IRELAND DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2021-2030 (USD MILLION)

TABLE 255 IRELAND ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 256 IRELAND MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 257 IRELAND GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 258 IRELAND DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 259 IRELAND SOLUTIONS IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 260 IRELAND SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 261 IRELAND PROFESSIONAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 262 IRELAND DATA CENTER CONSTRUCTION MARKET, BY TIER STANDARDS, 2021-2030 (USD MILLION)

TABLE 263 IRELAND DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE/ DATA CENTER SIZE, 2021-2030 (USD MILLION)

TABLE 264 IRELAND SMALL SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 265 IRELAND MEDIUM SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 266 IRELAND LARGE SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 267 IRELAND DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 268 IRELAND DATA CENTER CONSTRUCTION MARKET, BY END-USER, 2021-2030 (USD MILLION)

TABLE 269 IRELAND BANKING, FINANCIAL SERVICES AND INSURANCE (BFSI) IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 270 IRELAND GOVERNMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 271 IRELAND IT AND TELECOMMUNICATION IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 272 IRELAND RETAIL & E-COMMERCE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 273 IRELAND HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 274 IRELAND MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 275 IRELAND MEDIA AND ENTERTAINMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 276 IRELAND PHARMACEUTICAL IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 277 IRELAND RESEARCH & ACADEMIC IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 278 IRELAND ENERGY & UTILITY IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 279 TURKEY DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2021-2030 (USD MILLION)

TABLE 280 TURKEY ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 281 TURKEY MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 282 TURKEY GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 283 TURKEY DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 284 TURKEY SOLUTIONS IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 285 TURKEY SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 286 TURKEY PROFESSIONAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 287 TURKEY DATA CENTER CONSTRUCTION MARKET, BY TIER STANDARDS, 2021-2030 (USD MILLION)

TABLE 288 TURKEY DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE/ DATA CENTER SIZE, 2021-2030 (USD MILLION)

TABLE 289 TURKEY SMALL SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 290 TURKEY MEDIUM SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 291 TURKEY LARGE SCALE DC IN DATA CENTER CONSTRUCTION MARKET, BY TECHNIQUE, 2021-2030 (USD MILLION)

TABLE 292 TURKEY DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2021-2030 (USD MILLION)

TABLE 293 TURKEY DATA CENTER CONSTRUCTION MARKET, BY END-USER, 2021-2030 (USD MILLION)

TABLE 294 TURKEY BANKING, FINANCIAL SERVICES AND INSURANCE (BFSI) IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 295 TURKEY GOVERNMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 296 TURKEY IT AND TELECOMMUNICATION IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 297 TURKEY RETAIL & E-COMMERCE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 298 TURKEY HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 299 TURKEY MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 300 TURKEY MEDIA AND ENTERTAINMENT IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 301 TURKEY PHARMACEUTICAL IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 302 TURKEY RESEARCH & ACADEMIC IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 303 TURKEY ENERGY & UTILITY IN DATA CENTER CONSTRUCTION MARKET, BY OFFERING, 2021-2030 (USD MILLION)

TABLE 304 REST OF EUROPE DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2021-2030 (USD MILLION)

List of Figure

FIGURE 1 EUROPE DATA CENTER CONSTRUCTION MARKET: SEGMENTATION

FIGURE 2 EUROPE DATA CENTER CONSTRUCTION MARKET: DATA TRIANGULATION

FIGURE 3 EUROPE DATA CENTER CONSTRUCTION MARKET: DROC ANALYSIS

FIGURE 4 EUROPE DATA CENTER CONSTRUCTION MARKET: REGION VS COUNTRY MARKET ANALYSIS

FIGURE 5 EUROPE DATA CENTER CONSTRUCTION MARKET: COMPANY RESEARCH ANALYSIS

FIGURE 6 EUROPE DATA CENTER CONSTRUCTION MARKET: INTERVIEW DEMOGRAPHICS

FIGURE 7 EUROPE DATA CENTER CONSTRUCTION MARKET: DBMR MARKET POSITION GRID

FIGURE 8 EUROPE DATA CENTER CONSTRUCTION MARKET: VENDOR SHARE ANALYSIS

FIGURE 9 EUROPE DATA CENTER CONSTRUCTION MARKET: END-USER COVERAGE GRID

FIGURE 10 EUROPE DATA CENTER CONSTRUCTION MARKET: MULTIVARIATE MODELLING

FIGURE 11 EUROPE DATA CENTER CONSTRUCTION MARKET: INFRASTRUCTURE TYPE TIMELINE CURVE

FIGURE 12 EUROPE DATA CENTER CONSTRUCTION MARKET: SEGMENTATION

FIGURE 13 GROWING DEMAND FOR DATA CENTER INFRASTRUCTURE IS EXPECTED TO BE KEY DRIVERS IN THE MARKET FOR EUROPE DATA CENTER CONSTRUCTION MARKET IN THE FORECAST PERIOD OF 2023 TO 2030

FIGURE 14 ELECTRICAL INFRASTRUCTURE SEGMENT IS EXPECTED TO ACCOUNT FOR THE LARGEST SHARE OF EUROPE DATA CENTER CONSTRUCTION MARKET IN 2023 & 2030

FIGURE 15 DRIVERS, RESTRAINTS, OPPORTUNITIES, AND CHALLENGES OF THE EUROPE DATA CENTER CONSTRUCTION MARKET

FIGURE 16 COMPANIES SPENDING ON DATA CENTER

FIGURE 17 TOP 10 COUNTRIES WITH THE MOST DATA CENTER

FIGURE 18 PUBLIC CLOUD ADOPTION FOR BUSINESS OPERATIONS

FIGURE 19 FIGURE 4. AMOUNT SPENT BY COMPANIES ON CLOUD-BASED SERVICES

FIGURE 20 EUROPE DATA CENTER CONSTRUCTION MARKET: BY INFRASTRUCTURE TYPE, 2022

FIGURE 21 EUROPE DATA CENTER CONSTRUCTION MARKET: BY OFFERING, 2022

FIGURE 22 EUROPE DATA CENTER CONSTRUCTION MARKET: BY TIER STANDARDS, 2022

FIGURE 23 EUROPE DATA CENTER CONSTRUCTION MARKET: BY DATA CENTER TYPE/ DATA CENTER SIZE, 2022

FIGURE 24 EUROPE DATA CENTER CONSTRUCTION MARKET: BY TYPE, 2022

FIGURE 25 EUROPE DATA CENTER CONSTRUCTION MARKET: BY END-USER, 2022

FIGURE 26 EUROPE DATA CENTER CONSTRUCTION MARKET: SNAPSHOT (2022)

FIGURE 27 EUROPE DATA CENTER CONSTRUCTION MARKET: BY COUNTRY (2022)

FIGURE 28 EUROPE DATA CENTER CONSTRUCTION MARKET: BY COUNTRY (2023 & 2030)

FIGURE 29 EUROPE DATA CENTER CONSTRUCTION MARKET: BY COUNTRY (2022 & 2030)

FIGURE 30 EUROPE DATA CENTER CONSTRUCTION MARKET: BY INFRASTRUCTURE TYPE (2023 - 2030)

FIGURE 31 EUROPE DATA CENTER CONSTRUCTION MARKET: COMPANY SHARE 2022 (%)